Thursday, January 10, 2008
Post Christmas Break
Christmas break was nice and relaxing but now we gotta get things rolling. A lot happened over the break... the site's neighbor's water line bust and flooded our site so we still haven't been able to get the dirt work done because of the dampness. This pushes back our ground breaking date and our whole construction schedule....boooooo! Plus almost everyone that went out to the site to chop up trees on the site before the break got in to poison sumac. Luckily I was in the studio working on the permit drawings so I didn't get into it.
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment